Features:
- BMW M3 of the E46 generation
- Stance-style build
- Modified suspension
- Adjusted wheel alignment
- Low and wide appearance
- Inspired by car tuning culture
- Part of BMW's M series
This BMW E46 M3 brings the stance look to Assetto Corsa. Its suspension and wheel alignment have been modified to give the car a low and wide appearance, a style that is hugely popular in the tuning community.
It suits players who care as much about how a car sits as how it drives, and makes a great subject for screenshots and relaxed cruising.
