Skip to content
Join our Discord for updates & support Discord

Home / Games / Assetto Corsa

Assetto Corsa Skins

959 mods

Browse trending picks and fresh uploads for Assetto Corsa—the grid below jumps straight into the catalog.

Filters
Active filters: Skins Clear all
Manthey EMA Grello Porsche 992 GT3 R – 2024 NLS N24H Livery Assetto Corsa mod screenshot

The 2024 Manthey EMA Grello livery for the Porsche 992 GT3 R in Assetto Corsa, the green and yellow car number 911 from the NLS and N24H.

  • Skins
  • Livery
  • Porsche
  • 992 GT3 R
  • GT3 R
  • Manthey EMA
  • Grello
  • Number 911
  • NLS
  • N24H
  • 2024
  • Endurance racing
  • GT3
  • Mentosmann

Slidewayz by Slidewayz Rank:LITETOP

Assetto Corsa Skins · Mod version: V1.0 · Version: 1.16.x

View mod
Updated 6 days ago Views 5 views Downloads 2 Likes 0 Dislikes 0 Comments 0
File Size: 10.6 MB
Formula Hybrid 2017 RB13 Ricciardo – Car 3 Livery Assetto Corsa mod screenshot

An RB13 livery for the Formula Hybrid 2017 in Assetto Corsa, carrying D. Ricciardo's number 3 and fitting both the Standard and S1 car versions.

  • Skins
  • Livery
  • Formula Hybrid 2017
  • RB13
  • Ricciardo
  • Number 3
  • Formula car
  • Open wheel
  • 2017 season
  • Race livery
  • Finn S1 version
  • Standard version
  • AC76
  • Version 1.1

Slidewayz by Slidewayz Rank:LITETOP

Assetto Corsa Skins · Mod version: V1.1 · Version: 1.16.x

View mod
Updated 6 days ago Views 4 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 35.5 MB
Audi R8 LMS Team WRT 2015 – Blancpain Sprint Skin Pack Assetto Corsa mod screenshot

Team WRT liveries from the 2015 Blancpain Sprint Series for the Audi R8 LMS in Assetto Corsa, covering the team's cars numbered 1 to 4.

  • Skins
  • Livery pack
  • Audi
  • R8 LMS
  • Audi R8 LMS
  • Team WRT
  • Blancpain
  • Sprint Series
  • 2015
  • GT racing
  • Race livery
  • Cars 1 to 4
  • Erg
  • Version 1.0

N0mad Drift by N0mad Drift Rank:LITETOP

Assetto Corsa Skins · Mod version: V1.0 · Version: 1.16.x

View mod
Updated 6 days ago Views 2 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 20.0 MB
McLaren MP4-12C GT3 Marlboro Honda – Legendary Racing Livery Assetto Corsa mod screenshot

Bring a classic touch to Assetto Corsa with this Marlboro McLaren Honda skin for the MP4-12C GT3, inspired by Ayrton Senna's iconic MP4/4 era.

  • skin
  • McLaren MP4-12C GT3
  • Ayrton Senna
  • Marlboro livery
  • Honda
  • historical
  • white red
  • F1 inspired
  • classic
  • Senna tag
  • racing
  • Assetto Corsa
  • Ryan Clark
  • motorsport

MaxRPM Andi by MaxRPM Andi Rank:LITETOP

Assetto Corsa Skins · Mod version: V3.0 · Version: 1.16.x

View mod
Updated 1 week ago Views 4 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 7.7 MB
BMW M3 GT2 Jägermeister – Racing Livery Skin Assetto Corsa mod screenshot

Bring a bold Jägermeister-inspired look to the BMW M3 GT2 in Assetto Corsa with this orange racing skin, created by nobrakes for fans of classic motorsport designs.

  • skin
  • BMW M3 GT2
  • Jägermeister
  • racing livery
  • orange
  • motorsport
  • classic look
  • standalone
  • Assetto Corsa
  • custom graphics
  • easy install
  • customization
  • GT2
  • nobrakes

KrisztiTuning by KrisztiTuning Rank:LITETOP

Assetto Corsa Skins · Mod version: V1.0 · Version: 1.16.x

View mod
Updated 1 week ago Views 6 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 1.7 MB
Custom Toyota Supra MKIV featuring a vibrant Hankook racing livery, showcasing sleek design and dynamic styling.

Give your Assetto Corsa Toyota Supra MKIV a fresh look with this distinctive Hankook-themed skin by schUPpor, perfect for fans of custom liveries.

  • skin
  • Toyota Supra
  • MKIV
  • Hankook
  • racing
  • tuned
  • visual
  • sponsor
  • custom livery
  • game skin
  • schUPpor
  • KS car
  • Assetto Corsa
  • car skin

Tabornok3 by Tabornok3 Rank:LITETOP

Assetto Corsa Skins · Mod version: V3.0 · Version: 1.16.x

View mod
Updated 1 week ago Views 2 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 3.7 MB
Black Falcon AMG GT3 Skin Pack – Racing Team Liveries Collection Assetto Corsa mod screenshot

Add Black Falcon-inspired liveries and interiors to your AMG GT3 cars in Assetto Corsa. This pack features 12 cars with detailed race suits and custom interiors.

  • Skins
  • Black Falcon
  • AMG GT3
  • Racing suits
  • Custom interiors
  • 12 cars
  • Race liveries
  • Expanded pack
  • Team skins
  • Assetto Corsa
  • Motorsport
  • Car customization
  • High-quality
  • Ryan_Lee

PolarDrift by PolarDrift Rank:LITETOP

Assetto Corsa Skins · Mod version: V1.5 · Version: 1.16.x

View mod
Updated 1 week ago Views 3 views Downloads 0 Likes 0 Dislikes 0 Comments 0
File Size: 122.1 MB

Assetto Corsa Mods for Cars, Tracks and Racing Content

Discover Assetto Corsa mods for new cars, racing tracks, visual upgrades and community-made driving content. CrashMods helps players find free Assetto Corsa downloads with clear categories, fresh updates and useful mod details.

  • Browse Assetto Corsa car mods, track mods and racing add-ons.
  • Find community content for drifting, racing, cruising and realistic driving.
  • Explore mod pages with images, descriptions and download links in one place.

Assetto Corsa has a huge modding scene, and this archive is designed to make it easier to find quality cars, circuits and driving experiences without digging through scattered sources.

Assetto Corsa mods — vetting, installing, common questions

🛡️ How we vet the files

934 of the 959 Assetto Corsa mods carry a finished clean VirusTotal verdict (97%).

  • Until the check finishes the upload stays hidden: nobody but you and the team can reach it.
  • 25 file(s) exceed the 650 MB automatic scan limit — we check those by hand and their card says “size limit”.
  • The download button names the host before you leave the site — and one click reports anything that looks wrong.

💾 Installing a Assetto Corsa mod

Assetto Corsa mods live in the content folder — Content Manager does the work for you.

  1. Download the file.
  2. Easiest way: drop it onto Content Manager and install.
  3. Manually: cars → assettocorsa\content\cars, tracks → content\tracks.
  4. Start the game and pick the new car or track.

Full Assetto Corsa installation guide →

❓ Frequently asked questions

Are the Assetto Corsa mods on CrashMods safe?

Every uploaded file is scanned with VirusTotal automatically BEFORE the mod goes public. Assetto Corsa currently has 959 mods: 934 carry a finished clean verdict, and 25 file(s) exceed the 650 MB automatic scan limit (we review those by hand). The result is shown on each card, and you can report any mod that looks wrong.

How do I install a Assetto Corsa mod?

Assetto Corsa mods live in the content folder — Content Manager does the work for you. 1) Download the file. 2) Easiest way: drop it onto Content Manager and install. 3) Manually: cars → assettocorsa\content\cars, tracks → content\tracks. 4) Start the game and pick the new car or track.

Are these mods free?

They are free to download — there is no paywall on the Assetto Corsa catalogue and no sign-up required. A mod is only paid if its creator set a price, and that price is stated plainly on the card and the mod page.

How do I know which game version a mod fits?

Every Assetto Corsa mod card states the game version it was built for, and the sidebar lets you filter by version. After a game update, filter to the newest version first.

Stay in the loop

Get the latest mods & updates in your inbox.

✓ Thanks! We will keep you posted.

💬
New mods & updatesBe the first to know.
🛡️
Verified & safeQuality checked by our team.
🎁
Community perksEvents, contests & more.

© 2026 CrashMods — All rights reserved.
Safe & TrustedEvery mod is scanned and reviewed to ensure a safe experience.
SecureYour safety is our priority.